Image Details

Choose export citation format:

The Robotic Multiobject Focal Plane System of the Dark Energy Spectroscopic Instrument (DESI)

  • Authors: Joseph Harry Silber, Parker Fagrelius, Kevin Fanning, Michael Schubnell, Jessica Nicole Aguilar, Steven Ahlen, Jon Ameel, Otger Ballester, Charles Baltay, Chris Bebek, Dominic Benton Beard, Robert Besuner, Laia Cardiel-Sas, Ricard Casas, Francisco Javier Castander, Todd Claybaugh, Carl Dobson, Yutong Duan, Patrick Dunlop, Jerry Edelstein, William T. Emmet, Ann Elliott, Matthew Evatt, Irena Gershkovich, Julien Guy, Stu Harris, Henry Heetderks, Ian Heetderks, Klaus Honscheid, Jose Maria Illa, Patrick Jelinsky, Sharon R. Jelinsky, Jorge Jimenez, Armin Karcher, Stephen Kent, David Kirkby, Jean-Paul Kneib, Andrew Lambert, Mike Lampton, Daniela Leitner, Michael Levi, Jeremy McCauley, Aaron Meisner, Timothy N. Miller, Ramon Miquel, Juliá Mundet, Claire Poppett, David Rabinowitz, Kevin Reil, David Roman, David Schlegel, Santiago Serrano, William Van Shourt, David Sprayberry, Gregory Tarlé, Suk Sien Tie, Curtis Weaverdyck, Kai Zhang, Marco Azzaro, Stephen Bailey, Santiago Becerril, Tami Blackwell, Mohamed Bouri, David Brooks, Elizabeth Buckley-Geer, Jose Peñate Castro, Mark Derwent, Arjun Dey, Govinda Dhungana, Peter Doel, Daniel J. Eisenstein, Nasib Fahim, Juan Garcia-Bellido, Enrique Gaztañaga, Satya Gontcho A Gontcho, Gaston Gutierrez, Philipp Hörler, Robert Kehoe, Theodore Kisner, Anthony Kremin, Luzius Kronig, Martin Landriau, Laurent Le Guillou, Paul Martini, John Moustakas, Nathalie Palanque-Delabrouille, Xiyan Peng, Will Percival, Francisco Prada, Carlos Allende Prieto, Guillermo Gonzalez de Rivera, Eusebio Sanchez, Justo Sanchez, Ray Sharples, Marcelle Soares-Santos, Edward Schlafly, Benjamin Alan Weaver, Zhimin Zhou, Yaling Zhu, Hu Zou

Joseph Harry Silber et al 2023 The Astronomical Journal 165 .

  • Provider: AAS Journals

Caption: Figure 30.

Mass production of fiber positioners is plotted at left. We produced a total of 7148 robots. A preproduction run of 440 units (not shown here) lasted from 2016 December–2017 March. Tooling and procedures were finalized by the time of a 2017 May manufacturing readiness review. Full production began in 2017 June. By fall 2017, all manufacturing startup issues had been resolved, and production accelerated to eventually exceed the planned cadence (500 units per month) by mid-2018. Upper right: members of the production team at UM in the positioner assembly clean room. Lower right: some subassembly bonding fixtures.

Other Images in This Article

Show More

Copyright and Terms & Conditions

Additional terms of reuse